World of Health Hospital Banská Štiavnica

For VN Žiar nad Hronom – Banská Štiavnica operation, we performed the role of project management in the reconstruction of the boiler room in the Stropkov hospital. As part of the reconstruction, the original boiler from the manufacturer ČKD was replaced with a new gas boiler Hoval, the original chimney body was lined, and the relevant pipes, fittings and insulation were replaced with new ones. The reconstruction was carried out while the boiler room was in full operation. The reconstruction included the modernization of the boiler room's measurement and control.

Nemocnica svet zdravia Banská Štiavnica Obrázok 1